Prior to this project actually breaking ground, the word Garage had become something of a 6-lettered swear word in our family. You see, we bought this house ~5 years ago only after I had verified that the setbacks and septic were ok to support building this garage. I've built foam core models in 1:20 scale; I've spent hundreds of hours playing with various designs with home CAD software.; I've studied neighborhood covenants, code books, and educated myself on proper building techniques. And through this all, and much to my wife's dismay, I've been talking about this experience to the point of driving those closest to me nuts. So, since around the beginning of this year, when I really started to get this ball rolling, this garage has been affectionately referred to as "The G-word".

Tuesday, August 3, 2010

The list is getting shorter

The list of stuff left to do is getting shorter. Much shorter.

The crew came back and (as promised) finished up the boxing and siding work in a day. Except for garage doors, we are now officially dried in! Garage doors arrive late next week, so now it's just a few "punch-list" type items to take care of in the next week and we're mostly done. With the contractor's part at least.

I've been able to finish the exterior priming over the last couple nights, so we no longer have any exposed wood surfaces. Need to get the caulking done before we can get a C/O, but not a whole lot left to do for that.

Now to figure out the details for electrical....